The seat beside the driveway

A decision record somebody can price without pretending it is a construction drawing.

The modelled change, whether it has been tried at the place, the geometry it depends on, the annual consequence, what must be verified before ordering, what success looks like, and the questions the bid still has to answer.

October 30th, today's date

5:00 PM

Decision record · revision 1

Face the seating east

Record demo-driveway-radiant:1:rotate-seat:2026:10:30:17. Read on 30th October 2026.

seasonal across seasons

Turn the chairs to look east, which puts the low sun behind the shoulder instead of across the table.

Baseline

No

Read for an hour · The bench in the shade

Forecast

Works

+1 hour this day

Across the year

seasonal

The status improves in 2 of 4 seasons and does not get worse in the rest. 2 stay No.

Survey standing: Mapped: Shade, sky view and daily light are computed from the geometry on this plan. Unmeasured dimensions remain estimates, not verified measurements.

Real-world trial: none yet. Everything above is a forecast from the plan.

Buy nothing yetTry a reversible version at the place and recheck it before this goes out to price.

Design intent dimensions

Bearing68°

Four-season acceptance basis

SeasonBeforeAfterHoursControlling after
JanuaryTightWorksHours not claimednone
AprilNoNoHours not claimedWhat it feels like
JulyNoNoHours not claimedWhat it feels like
OctoberNoTightHours not claimedWhat it feels like

The status improves in 2 of 4 seasons and does not get worse in the rest. 2 stay No.

Site controls this price depends on

ControlValueProvenanceBefore ordering
The house14 ft 5 in highYou said so: You told us this, and it beats what the model worked out.recorded
Deep eave11 ft 2 in high; underside 10 ft 2 inMeasured: Taken with a tape, a compass or a clock at the place.recorded
The bench in the shadePoint at 3 ft 7 in above ground; facing 270°You said so: You told us this, and it beats what the model worked out.recorded

Verification queue

  1. Who can actually see in. Sit where you actually sit and look around. Mark the one window or path you can see a person from. Until one exists, privacy is a question we are not answering rather than one that is fine.
    This is not a refinement. Nothing can answer this question until somebody marks it. · sit-there
  2. What you are looking at. Mark the direction of the view worth keeping. No view has been marked yet, so nothing weighs what the view is worth, and a screen that blocks it looks free.
    This is not a refinement. Nothing can answer this question until somebody marks it. · sit-there

Acceptance checks

  • Re-run the reading for reading for an hour at The bench in the shade after installation and confirm the controlling failure is not worse than the forecast for this proposal.
  • Check the completed geometry against the decision record before accepting substitutions: bearing 68°.
  • Confirm the installed intervention keeps the forecast annual behaviour (seasonal).
  • Photograph the completed work from the original reading point and record any change to view, glare, privacy line or usable hours that the model did not predict.

Questions every bid should answer

  1. Still unanswered: privacy exposure, noise.
  2. What exact product, fixing/anchoring method and maintenance regime is included in the price?
  3. Which dimensions or assumptions in this record would your proposal change, and why?
  4. What is excluded from the price: structural design, footing design, drainage, electrical work, planning/permit work, boundary verification or underground-service locating?

Explicit exclusions and professional boundaries

CheckNo view corridor is marked, so only the sun decides which way the chairs face, and they may end up with their backs to the view.
CheckThis decision record is design intent and decision evidence, not a construction drawing, structural calculation, permit set, boundary survey or setting-out document.
CheckThis record does not determine wind or snow loading, foundation or footing geometry, attachment adequacy, drainage works, electrical compliance, buried-service clearance, property lines or required approvals. Those questions remain with qualified people who can inspect the site and selected product.