The courtyard with two different privacy problems

A decision record somebody can price without pretending it is a construction drawing.

The modelled change, whether it has been tried at the place, the geometry it depends on, the annual consequence, what must be verified before ordering, what success looks like, and the questions the bid still has to answer.

October 30th, today's date

5:00 PM

Decision record · revision 1

A 6 ft 10 in screen 9 ft 1 in from the seat

Record demo-adversarial-opposite-observers:1:privacy-screen:2026:10:30:17. Read on 30th October 2026.

weak across seasons

A screen 6 feet 10 inches high and about 7 feet 3 inches wide, standing 9 feet 1 inch from the seat on the line to East upstairs window.

Baseline

Works

Read for an hour · Reading chair

Forecast

Works

No extra hours this day

Across the year

weak

The status does not move in any sampled season.

Survey standing: Mapped: Shade, sky view and daily light are computed from the geometry on this plan. Unmeasured dimensions remain estimates, not verified measurements.

Real-world trial: none yet. Everything above is a forecast from the plan.

Buy nothing yetTry a reversible version at the place and recheck it before this goes out to price.

Design intent dimensions

Height6 ft 10 in
Width7 ft 3 in
Distance from reading point9 ft 1 in
Bearing85°

Four-season acceptance basis

SeasonBeforeAfterHoursControlling after
JanuaryNoNoHours not claimedWhat it feels like
AprilWorksWorksHours not claimednone
JulyNoNoHours not claimedWhat it feels like
OctoberWorksWorksHours not claimednone

The status does not move in any sampled season.

Site controls this price depends on

ControlValueProvenanceBefore ordering
House23 ft highMeasured: Taken with a tape, a compass or a clock at the place.recorded
Existing side fence5 ft 11 in highMeasured: Taken with a tape, a compass or a clock at the place.recorded
Reading chairPoint at 3 ft 7 in above ground; facing 190°Measured: Taken with a tape, a compass or a clock at the place.recorded
East upstairs window36 ft from the reading point; eye 15 ft 1 in above datumMeasured: Taken with a tape, a compass or a clock at the place.recorded
West shared path27 ft from the reading point; eye 5 ft 3 in above datumMeasured: Taken with a tape, a compass or a clock at the place.recorded

Verification queue

    Acceptance checks

    • Re-run the reading for reading for an hour at Reading chair after installation and confirm the controlling failure is not worse than the forecast for this proposal.
    • Check the completed geometry against the decision record before accepting substitutions: height 6 ft 10 in, width 7 ft 3 in, distance from reading point 9 ft 1 in, bearing 85°.
    • Confirm the installed intervention keeps the forecast annual behaviour (weak).
    • Photograph the completed work from the original reading point and record any change to view, glare, privacy line or usable hours that the model did not predict.

    Questions every bid should answer

    1. How will you verify: A confirmed observer?
    2. How will you verify: Somewhere on your own land to stand it?
    3. Measure the actual height available before ordering: this is sized at 6 feet 10 inches and about four inches either way changes whether it works.
    4. Mark 9 feet 1 inch out on the ground and stand there before committing. The geometry is only as good as that distance.
    5. Still unanswered: noise.
    6. What exact product, fixing/anchoring method and maintenance regime is included in the price?
    7. Which dimensions or assumptions in this record would your proposal change, and why?
    8. What is excluded from the price: structural design, footing design, drainage, electrical work, planning/permit work, boundary verification or underground-service locating?

    Explicit exclusions and professional boundaries

    CheckAnything freestanding taller than a person is a wind-loaded structure and may need consent as well as footings.
    CheckThis closes the line from East upstairs window only. You are also overlooked from elsewhere, and that needs its own answer.
    CheckThis decision record is design intent and decision evidence, not a construction drawing, structural calculation, permit set, boundary survey or setting-out document.
    CheckThis record does not determine wind or snow loading, foundation or footing geometry, attachment adequacy, drainage works, electrical compliance, buried-service clearance, property lines or required approvals. Those questions remain with qualified people who can inspect the site and selected product.